Turn these engineering notes into a release plan with owners, milestones, and rollback checks. Keep the answer practical for a gemini-3.5-flash integration.
Start with the goal and release window, assign an owner for each milestone, define an observable success condition, and include a tested rollback path before launch. This example is tailored to the gemini-3.5-flash model page.